Feasibility
Full
feasibility studies have been carried out for various sites around the
globe. In principle there are virtually no sites that cannot benefit from
the EBM technology, from the tops of mountains to the remote rural areas
to the deepest mines in the earth.
The
need for ventilation to dissipate heat, the necessary paralleling equipment
to parallel with the existing utility grid and the appropriate houseing
for the equipment are the major variables that must be closely studied
in the preparation of the feasibility study. The full feasibility study
will incorporate schematics, line drawings and manufacturers specificiation
sheets that must be created and/or compiled.
As
of December 2007 a Power Purchase Agreement for 4x75 Mega-Watt plants
for China has
signed and is now pending final government approval, which is expected
by March 2008.
In Ontario, four projects are in progress for locations in Brampton, Scarborough,
Toronto and Alliston. The Brampton location, First, should be operational
by December 2008.
Conclusion
G Energy Technology
of Toronto, Canada is now opening the EBM technology for review. Several
scenarios have been created for interested parties to exploit the technology
immediately. These scenarios include granting licenses for distribution
and manufacturing, creating power purchase agreements for end-users as
well as joint ventures.
We
believe that EBM has the ability to make the world more self-sufficient
in its energy infrastructure, working towards a vision of self-sufficiency
and prepared for the future demand increases. The EBM technology has the
promise to be able to assist in accomplishing this pursuit in a relatively
short period of time. The spin-off industries including manufacturing
and exporting the equipment, employment in maintaining the equipment and,
eventually, increasing the export of electricity to neighbors should be
regarded as inevitable.
How
to Aquire EBM Technology
The EBM Technology
is available to be installed in a location of our customers choice, any
MW size at no cost to you our customer. All that is required is a Power
Purchase Agreement be signed. All costs associated with the installation
and commissioning are ours. Cost of land on which the unit is located
and the interconnect to the grid or connection to a buildings main distribution
panel is negotiable.
 
|